"T Plus" has updated the equipment of the central heating points in Dzerzhinsk.

"T Plus" has updated the equipment of the central heating points in Dzerzhinsk.

      On August 6, 2026, at 11:43, the Society of Thermal Energy of the Dzerzhinsk Heating Networks of the Nizhny Novgorod branch of "T Plus" replaced equipment at several central heating points in the city.

      In preparation for the heating season of 2026/2027, specialists installed new heat exchangers and pumps at central heating points No. 3 on Oktyabrskaya Street, No. 7 on Chapayev Street, and No. 37 on Tereshkova Street. Heat exchange equipment was also replaced at CHP No. 11 on Popov Street.

      "The completed activities will enhance the reliability of heating systems and hot water supply and help ensure stable heat supply for residents this coming winter," noted Irina Gneusheva, director of the Nizhny Novgorod branch of "T Plus."

      The new equipment is fully ready for operation. NIA "Nizhny Novgorod" has channels on Telegram and MAX. Subscribe to stay updated on major events, exclusive materials, and operational information. Copyright © 1999—2025 NIA "Nizhny Novgorod." When reprinting, a hyperlink to NIA "Nizhny Novgorod" is mandatory. This resource may contain materials 18+.

Другие Новости Нижнего (Н-Н-152)

"T Plus" has updated the equipment of the central heating points in Dzerzhinsk.

News of Nizhny Novgorod