Test runs on the tram tracks have begun at the Oksky Descent in Nizhny Novgorod.

Test runs on the tram tracks have begun at the Oksky Descent in Nizhny Novgorod.

      15 August 2025 08:00

      [207]

      Society

      Technical running-in of tram tracks has begun on the section from Krasnoselskaya Street to the Molitovsky Bridge in Nizhny Novgorod, Ecological Projects LLC reported.

      The inspection is being carried out using a special tower car that allows assessment of the condition of the rails and the overhead contact line. During the running-in, specialists identify possible defects and eliminate them immediately.

      "Due to the complexity of the section, the work will take several days. The exact date for the resumption of tram services will be announced later," the company said.

      Recall that reconstruction of the tram tracks on this stretch began in February. The contractor reconfigured the track bed and replaced the contact network.

      It was previously reported that repair of the tram loop on Ivlieva Street is scheduled for 2026. NIA "Nizhny Novgorod" has a Telegram channel. Subscribe to stay informed about major events, exclusive materials and timely information. Copyright © 1999—2025 NIA "Nizhny Novgorod". When reprinting, a hyperlink to NIA "Nizhny Novgorod" is mandatory. This resource may contain 18+ materials.

Другие Новости Нижнего (Н-Н-152)

Test runs on the tram tracks have begun at the Oksky Descent in Nizhny Novgorod.

Nizhny Novgorod News