"T Plus" is updating the heating network on Lenin Komsomol Avenue in Dzerzhinsk.
On July 9, 2026, at 12:29, the Society of Heat Energy of the Nizhny Novgorod branch of "T Plus" began the reconstruction of a 250 mm heating pipeline along Lenin Komsomol Avenue in Dzerzhinsk. In the section between Builders Street and Budyonny Street, specialists will replace 640 m of the heating network for the new heating period. The work will enhance the reliability of heat supply for residents in the western part of the city.
In total, this year "T Plus" plans to upgrade 10.7 km of heating networks in Dzerzhinsk. More than 1 km of heating pipelines have already been fully installed on Sverdlov Avenue and Petrishcheva Street. Major relocations of main, distribution, and block pipelines are currently taking place on Tsiolkovsky and Dzerzhinsky Avenues, Budyonny Street, in the Western Lane, and other areas of the city.
"For the replacement, we use modern pipes insulated with polyurethane foam and equipped with an operational dispatch control system for remote monitoring of their condition. During the relocation period, clients receive hot water through temporary schemes. The work is on schedule, and heat will be supplied to all sections before the start of the heating period," noted Irina Gneusheva, director of the Nizhny Novgorod branch of "T Plus."
NIA "Nizhny Novgorod" has channels on Telegram and MAX. Subscribe to stay updated on major events, exclusive materials, and operational information. Copyright © 1999—2025 NIA "Nizhny Novgorod." When reprinting, a hyperlink to NIA "Nizhny Novgorod" is mandatory. This resource may contain materials 18+.
Другие Новости Нижнего (Н-Н-152)
"T Plus" is updating the heating network on Lenin Komsomol Avenue in Dzerzhinsk.
News of Nizhny Novgorod
